Millisecond-level power response enables rapid support for critical medium-voltage loads during voltage sags, short-duration interruptions, and other grid disturbances.
The modular BESS and PCS architecture allows system power and energy capacity to be configured according to project requirements, backup duration, and reliability targets.
Beyond backup power, the system can participate in peak-valley energy management, power regulation, reactive power support, and other power management functions during normal operation.